Project Development and Environment
Original Documents
- EIS (Environmental Impact Study) for I-4 Beyond the Ultimate, S.R. 528 – S.R. 472PDF
- FONSI (Finding of No Significant Impact) for I-4 Beyond the Ultimate, C.R. 532 – S.R. 528, 12/1999PDF
- FONSI (Finding of No Significant Impact) for I-4 in Polk County, S.R. 546 – U.S. 27, 12/1998PDF
- PER (Preliminary Engineering Report) for I-4 Beyond the Ultimate, S.R. 528 – S.R. 472, 08/2002PDF
- PER (Preliminary Engineering Report), Vol. I, for I-4 Beyond the Ultimate, C.R. 532 – S.R. 528, 06/2000PDF
- PER (Preliminary Engineering Report), Vol. II/Appendices, for I-4 Beyond the Ultimate, C.R. 532 – S.R. 528, 06/2000PDF
- PER (Preliminary Engineering Report) for I-4 in Polk County, S.R. 546 – U.S. 27, 06/1998PDF
Segment 1: County Road 532 to Beachline Expressway (State Road 528)
- AQA (Air Quality Analysis) Technical Memorandum, 07/2016PDF
- ConOps (Concept of Operations), 06/2016PDF
- CRA (Cultural Resource Assessment) for I-4 Beyond the Ultimate Segment 1A, C.R. 532 – C.R. 522PDF
- CRA (Cultural Resource Assessment) for I-4 Beyond the Ultimate Segment 1B, C.R. 522 – Central Florida ParkwayPDF
- CSER (Contamination Screening Evaluation Report), 07/2016PDF
- CSRP (Conceptual Stage Relocation Plan), 09/2016PDF
- Display Board: CD SystemPDF
- Display Board: RoadwayPDF
- Display Board: UtilitiesPDF
- ESBA (Endangered Species Biological Assessment), 09/2016PDF
- GEOTECH (Preliminary Geotechnical Engineering Investigation for Ponds), 12/2015PDF
- IMR (Interchange Modification Report) Draft, I-4 and S.R. 536 Off-Ramp, 08/2014PDF
- Level 2 Contamination Impact Assessment Report, 03/2015PDF
- LHR (Location Hydraulic Report), 09/2016PDF
- LJR (Lighting Justification Report), 12/2013PDF
- NSR (Noise Study Report), 07/2016PDF
- NSRA (Draft Noise Study Report Addendum), 01/2019PDF
- PER (Preliminary Engineering Report) with Appendices, 06/2017PDF
- Re-evaluation Form, 06/2017PDF
- Project Re-evaluation Form, 09/2016PDF
- PSE (Pavement Survey and Evaluation) Report, Segment 1A, 10/2012PDF
- PSE (Pavement Survey and Evaluation) Report, Segment 1B, 08/2013PDF
- PSR (Pond Siting Report), 09/2016PDF
- PTSR (Pavement Type Selection Report), 07/2014PDF
- Sand Skink Memo, Osceola County, 03/2014PDF
- Sand Skink Memo, Orange County, 08/2014PDF
- SAMR (Systems Access Modification Report) Re-evaluation and Appendices, 03/2017ZIP
- SAMR (System Access Modification Report) Signature Pages, 05/2017PDF
- UIR (Utility Impact Report), 04/2016PDF
- VE (Value Engineering) Study, 08/2016PDF
- WER (Wetland Evaluation Report), 09/2016PDF
Segment 2: State Road 528 to State Road 435 (Kirkman Rd)
- AQA (Air Quality Analysis) Technical Memorandum, 07/2016PDF
- Level 2 Contamination Impact Assessment Report, 03/2015PDF
- CRA (Cultural Resource Assessment)PDF
- CSER (Contamination Screening Evaluation Report), 07/2016PDF
- CSRP (Conceptual Stage Relocation Plan), 01/2016PDF
- ConOps (Concept of Operations), 06/2016PDF
- Display Board: UtilitiesPDF
- ESBA (Endangered Species Biological Assessment), 07/2016PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision), 08/2017PDF
- ROD (Records of Decision), 08/2017PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision) Appendix, 08/2017PDF
- GEOTECH (Preliminary Geotechnical Engineering Investigation for Ponds), 12/2015PDF
- LHR (Location Hydraulic Report), 08/2016PDF
- LJR (Lighting Justification Report), Final, 12/2013PDF
- NSR (Noise Study Report), 07/2016PDF
- PER (Preliminary Engineering Report) with Appendices, 06/2017PDF
- PSE (Pavement Survey and Evaluation) Report, 05/2014PDF
- PSR (Pond Siting Report), 08/2016PDF
- PTSR (Pavement Type Selection Report), 04/2014PDF
- Sand Skink Memo, Orange County, 08/2014PDF
- SAMR (Systems Access Modification Report) Re-evaluation and Appendices, 03/2017ZIP
- SAMR (System Access Modification Report) Signature Pages, 05/2017PDF
- UIR (Utility Impact Report), 04/2016PDF
- VE (Value Engineering) Study, 05/2015PDF
- WER (Wetland Evaluation Report), 07/2016PDF
Segment 3: State Road 434 to US 17-92
- Segment 3 Design Change Re-evaluation, 10/24/2019PDF
- AQA (Air Quality Analysis) Technical Memorandum, 07/2016PDF
- CRA (Cultural Resource Assessment)PDF
- CSER (Contamination Screening Evaluation Report), 07/2016PDF
- CSRP (Conceptual Stage Relocation Plan), 01/2016PDF
- ConOps (Concept of Operations), 06/2016PDF
- Consultative Re-evaluation for Segment 3 FHWA Concurrence, 01/2019PDF
- ESBA (Endangered Species Biological Assessment), 07/2016PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision), 08/2017PDF
- ROD (Records of Decision), 08/2017PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision) Appendix, 08/2017PDF
- GEOTECH (Preliminary Geotechnical Engineering Investigation for Ponds), 12/2015PDF
- Level 2 Contamination Impact Assessment Report, 03/2015PDF
- LHR (Location Hydraulic Report), 11/2016PDF
- LJR (Lighting Justification Report), Final, 12/2013PDF
- NSR (Noise Study Report), 07/2016PDF
- Noise Study Technical Memorandum: I-4 Beyond the Ultimate Segment 3, 12/2018PDF
- PER (Preliminary Engineering Report) with Appendices, 06/2017PDF
- Presentation: EE Williamson Access, 05/2014PDF
- PSR (Pond Siting Report), 11/2016PDF
- PTSR (Pavement Type Selection Report), 04/2014PDF
- SAMR (Systems Access Modification Report) Re-evaluation and Appendices, 03/2017ZIP
- Reversible Express Lanes Evaluation, 11/2014PDF
- SAMR (System Access Modification Report) Signature Pages, 05/2017PDF
- Status of Environmental Certification (Aux Lane, Pond, Sound Wall), 01/2019PDF
- Status of Environmental Certification (E.E. Williamson Bridge), 01/2019PDF
- UIR (Utility Impact Report), 04/2016PDF
- VE (Value Engineering) Study, 06/2014PDF
- VE (Value Engineering) Study for Wekiva Parkway/I-4 Interchange, 07/2014PDF
- WER (Wetland Evaluation Report), 07/2016PDF
Segment 4: US 17-92 to State Road 472
- AQA (Air Quality Analysis) Technical Memorandum, 07/2016PDF
- CSER (Contamination Screening Evaluation Report), 07/2016PDF
- CRA (Cultural Resource Assessment)PDF
- CSRP (Conceptual Stage Relocation Plan), 01/2017PDF
- ConOps (Concept of Operations), 06/2016PDF
- Final EFH Assessment May 2016PDF
- ESBA (Endangered Species Biological Assessment), 07/2016PDF
- Executed Resolution by the River to Sea TPO: Maintaining a Rail Envelope along I-4 throughout the MPA (01/2015)PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision), 08/2017PDF
- ROD (Records of Decision), 08/2017PDF
- FEIS and ROD (Final Environmental Impact Statement and Records of Decision) Appendix, 08/2017PDF
- GEOTECH (Preliminary Geotechnical Engineering Investigation for Ponds), 12/2015PDF
- LHR (Location Hydraulic Report), 08/2016PDF
- LJR (Lighting Justification Report), Final, 12/2013PDF
- NSR (Noise Study Report), 07/2016PDF
- PER (Preliminary Engineering Report) with Appendices, 06/2017PDF
- Presentation: District 5 Projects Update, River to Sea TPO, 11/2014PPT
- Presentation: PD&E Re-evaluation Study in Volusia County, River to Sea TPO, 05/2014PDF
- Presentation: PD&E Re-evaluation Study in Volusia County, DeBary City Council, 05/2014PDF
- PSR (Pond Siting Report), 08/2016PDF
- PTSR (Pavement Type Selection Report), 07/2014PDF
- SAMR (Systems Access Modification Report) Re-evaluation and Appendices, 03/2017ZIP
- SAMR (System Access Modification Report) Signature Pages, 05/2017PDF
- St. Johns River Multi-Use Bridge Concept Report, 11/2014PDF
- Structural Evaluation Study: I-4 over U.S. 17-92 and St. Johns River, 09/2014ZIP
- Technical Memorandum: Florida Scrub-Jay Survey, 07/2015PDF
- UIR (Utility Impact Report), 04/2016PDF
- VE (Value Engineering) Study, 05/2015PDF
- WER (Wetland Evaluation Report), 07/2016PDF
Segment 5: US 27 to County Road 532
- AQA (Air Quality Analysis) Technical Memorandum, 04/2017PDF
- ConOps (Concept of Operations), 06/2016PDF
- CRA (Cultural Resource Assessment)PDF
- CSER (Contamination Screening Evaluation Report), 04/2017PDF
- CSRP (Conceptual Stage Relocation Plan), 11/2015PDF
- Display Board: UtilitiesPDF
- ESBA (Endangered Species Biological Assessment), 04/2017PDF
- GEOTECH (Preliminary Geotechnical Engineering Investigation for Ponds), 03/2016PDF
- LHR (Location Hydraulic Report), 11/2016PDF
- LJR (Lighting Justification Report), Final, 12/2013PDF
- NSR (Noise Study Report), 04/2017PDF
- PER (Preliminary Engineering Report) with Appendices, 06/2017PDF
- PSR (Pond Siting Report), 11/2016PDF
- PTSR (Pavement Type Selection Report), 02/2016PDF
- Re-evaluation Form (Final), 03/2016PDF
- SAMR (Systems Access Modification Report) Re-evaluation and Appendices, 03/2017ZIP
- SAMR (System Access Modification Report) Signature Pages, 05/2017PDF
- UIR (Utility Impact Report), 04/2016PDF
- VE (Value Engineering) Study, 04/2015PDF
- WER (Wetland Evaluation Report), 12/2016PDF