Segment 3 (242592-4)

Segment 3 features the construction, widening and/or replacement of 25 bridges. In addition to 26 existing stormwater ponds, crews will build nine new ponds.

Length 8.9 miles

Boundaries I-4 from 1 mile east of S.R. 434 in Longwood to east of U.S. 17-92 at the Seminole-Volusia county line.

Cost Construction (w/Design): $468M

Funding Available in 2026

Special features The interchange at C.R. 46A will become a diverging diamond – a time-tested way to minimize congestion.

FDOT Project Manager


Hatem Aguib, P.E.
386-943-5559
hatem.aguib@dot.state.fl.us

Design Engineer

WSP
Abhay Thorat, P.E.
abhay.thorat@wsp.com