The interchange of Interstate 4 (I-4) and Apopka-Vineland Road (State Road (S.R.) 535) is a heavily traveled gateway
to theme parks, shopping, and resorts. Improvements consist of two Florida Department of Transportation (FDOT)
projects combined in a single, design-build contract.
Construction began fall 2023 and is expected to reach completion in 2027. The design for this project is ongoing. The
final configuration of the interchange will be very similar to what is shown in the documents and handouts below, but
small refinements are anticipated. This page will be updated as more information becomes available.
Project Descriptions
FPID No. 448914-1
This project will partially reconstruct the I-4 and Apopka-Vineland Road interchange to enhance safety and improve
access to and from westbound I-4. This project includes:
- Constructing a new loop ramp from northbound Apopka-Vineland Road to westbound I-4. The ramp will enhance safety
and mobility by eliminating the need for motorists to turn left across traffic.
- Realigning the westbound I-4 entrance ramp from southbound Apopka-Vineland Road, improving traffic flow and giving
motorists more time to merge onto I-4.
- Lengthening the westbound I-4 exit ramp to Apopka-Vineland Road to reduce backups onto the I-4 mainline.
- Milling and resurfacing Apopka-Vineland Road and extending storage for left and right turn lanes.
FPID No. 449771-1
This project will add a single, buffer-separated, westbound express lane to I-4 from west of S.R. 536 to west of
Daryl Carter Parkway. The complete express lane will be built in three separate projects extending from west of S.R.
536 to west of Sand Lake Road (S.R. 482).
Photos
I-4 and (S.R. 535)/Apopka-Vineland Road 2026/05/21
I-4 and Apopka-Vineland Road Interchange 2025/10/08
I-4 and Apopka-Vineland Road (S.R. 535) Interchange 2025/08/06
I-4 and Apopka-Vineland Road (S.R. 535) 2025/05/29
I-4 and Apopka-Vineland Road (S.R. 535) 2025/04/16
Renderings
Downloads
Articles
Posted: November 26, 2025
Crews at the Interstate 4 (I-4) and Apopka-Vineland Road (State Road (S.R.) 535) interchange are busy constructing ...
READ MORE
Posted: October 30, 2025
The improvements coming to the Interstate 4 (I-4) and Apopka-Vineland Road (State Road (S.R.) 535) interchange are ...
READ MORE
Posted: August 25, 2025
Florida Department of Transportation (FDOT) crews at the Interstate 4 (I-4) and Apopka-Vineland Road (State Road ...
READ MORE
Posted: February 26, 2025
Florida Department of Transportation (FDOT) crews are working across southern Orange County on multiple projects to ...
READ MORE