As part of I-4 Beyond the Ultimate, the Florida Department of Transportation (FDOT) is designing Interstate 4 (I-4) interchange improvements at Daryl Carter Parkway and Sand Lake Road (State Road 482).
The I-4 and Daryl Carter Parkway design project includes:
- Converting the Daryl Carter Parkway overpass into a diverging diamond interchange.
- Adding eastbound I-4 entrance and exit ramps and a westbound I-4 exit ramp at the new interchange. The westbound I-4 entrance ramp will be constructed at a later time with the final configuration.
The I-4 and Sand Lake Road design project includes:
- Reconstructing I-4 general use lanes from west of Sand Lake Road to the end of the I-4 Ultimate project, west of Kirkman Road (State Road 435).
- Reconstructing the Sand Lake Road interchange into a diverging diamond interchange with a loop ramp to Turkey Lake Road.
Construction for both these projects is planned to begin in early 2022. Learn more about these design plans by viewing the videos, social media, and handouts below.